Don's RV7 Project

 

This Web site will serve as my Van's RV7 construction log.  It is also my way of passing on my trials and tribulations while building the project.  I have made several decisions regarding the equipment I will incorporate into my aircraft. A large number of my decisions were influenced by talking to Dan Checkoway, an accomplished RV7 builder.  My "7" will be very similar to Dan's.  The engine will be an Aero Sport Performance/Lycoming with 200 HP and the AFP fuel injection system. The plane will be night and IFR legal.  The panel will consist of an EFIS1 and an EFIS Lite both G4 versions from BMA.  The rest of the panel will include GARMIN radios and transponder and the CNX80 GPS.  Engine instruments will be the Advanced Flight Systems AFS2500.  The ignitions will be electronic, built by EMAG

 

Tools

Current status Phase One Video

 

This is the demonstration RV7 at Van's. It has been converted to a trike gear instead of the tail dragger. Mine will be like this one, a tail dragger.


Empennage

Wings

Fuselage

Finish Kit

 

Panel

 

Firewall Forward

Final Assembly

 

 

 

Empennage

Oct 28 2003

Oct 29 2003

Oct 30 2003

Nov 1 2003

Nov2 2003

Nov3 2003

Nov5 2003

Nov 6 2003

Nov8 2003

Nov 10 2003

Nov 11 2003

Nov 13 2003

Nov 14 2003

Nov 15 2003

Nov 17 2003

Nov 18-Dec2 Vacation

DEC 6

DEC 7

Dec 8

DEC 11

DEC 13

DEC 14

DEC 17

DEC 20

DEC 21

DEC 22

DEC 24

DEC 27

DEC 28

Jan 1, 2004

Jan 3, 2004

JAN 4, 2004

SEPTEMBER 3, 2007 Glass work on the vertical stabilizer and rudder

SEPTEMBER 4, 2007 More glass work on the vertical stab and rudder

WINGS

Ailerons

JAN 1, 2004

JAN 4, 2004

APRIL 12, 2004 Worked on the ailerons and flaps

FLAPS

APRIL 30,2004 Built and installed right flap.

MAY 1, 2004 Built left flap.

Wings

Right wing

JAN 8, 2004

JAN 10, 2004

JAN 11, 2004

JAN 17, 2004

JAN 18, 2004

JAN 19, 2004

JAN 20, 2004 Riveted rear spars. Drilled holes for electrical conduit. Clecoed skeleton together.

JAN 24, 25,2004 Built wing stand arms, drilled ribs to spars and primed ribs. Riveted skeleton together and hung it on the stand.

JAN 26,2004 Drilled top and bottom wing skins. Assembled leading edge.

JAN 27, 2004 Drilled leading edge end rib and joint plate. Drilled tie down ring hole.

FEB 8, 2004 Riveted leading edge. Installed landing light. Installed leading edge.

FEB 22, 2004 Dimpled and de-burred ribs. De-burred right wing skins.

FEB 28,2994 Riveted top skin.

FEB 29,2004 Built wing dolly and drilled spar brace, aileron gap seal and aileron brackets

MARCH 27, 2004 Installed the roll servo for the autopilot. Riveted the right bottom inboard wing skin.

MARCH 28, 2004 Riveted the right bottom outboard wing skin.

Right Fuel Tank

JAN 30, 2004 Assembled/clecoed fuel tank.

JAN 31, 2004 Drilled tank attach brackets using the method that Dan Checkoway devised. Drilled drain valve mount to tank skin.

FEB 1, 2004 Worked on fuel tank hardware and stiffeners

FEB 9, 2004 Built the trap door and tooling hole cover for the right fuel tank.

FEB 14, 2004 Sealed the five inner fuel tank ribs and stiffeners in the right fuel tank.

FEB 15, 2004 Installed the inboard and outboard ribs in the right fuel tank. Finished fuel level senders. Finished vent and return.

Feb 21, 2004 Closed right tank and installed it. No pressure test yet.

Left Wing

MARCH 6, 2004 Primed left wing ribs and right aileron brackets. Had an inspection by a EAA tech counselor.

MARCH 7, 2004 Assembled the left wing skeleton. Assembled and installed the right aileron brackets and one push rod.

MARCH 8, 2004 Clecoed top and bottom skins on left wing. Built one of the push rods for the right wing.

MARCH 13-16,2004 Leading edge and fuel tank prep.

MARCH 22, 2004 Built the left leading edge and installed the taxi light. Installed the leading edge.

APRIL 5, 2004 DE-burred and dimpled the left wing skeleton and the top skins. Clecoed the top skin on.

APRIL 10, 2004 The tank is back on and the top skin is on. The wing jig is disassembled and the wings are in the dolly.

APRIL 17, 2004 Installed the flap brace and aileron gap seal.

APRIL 18, 2004 Built the left flap.

APRIL 19, 2004 De-bured and dimpled the left flap and the left bottom skins.

APRIL 24, 2004 Worked on the flaps and the electrical conduit in the left wing. Did a "BFR" complete with a one turn spin.

MAY 15, 2004 Installed inner lower left wing panel and pitot tube fittings.

OCTOBER 16, 2004 Installed pitot tube. Riveted the last panel on the wings.

Left Fuel Tank

MARCH 31, 2004 Started work on the left fuel tank.

APRIL 3, 2004 Installed the five inner ribs in the left fuel tank.

APRIL 4, 2004 Finished the left fuel tank and installed it.

APRIL 6, 2004 Pressure tested the tank.

Fuselage

Bulkheads

MAY 24, 2004 Fuselage arrived and inventory was completed.

MAY 29, 2004 Drilled Firewall

MAY 30, 2004 Worked on the F704 bulkhead.

MAY 31, 2004 Finished F704 and started F705

JUNE 3,2004 Worked on Bulkhead F705

JUNE 6,2004 Finished F705 bulkhead.

JUNE 7, 2004 Built F706 bulkhead.

JUNE 19, 2004 Built the F711 and F712 bulkheads and drilled the tail wheel spring mount. Also attended the Aero Electric seminar in Long Beach. Very worthwhile!!

JUNE 26, 2004 Bent and drilled the longerons. Did the chemical prep on all of the bulkhead parts.

JUNE 27, 2004 Primed all the bulkhead parts. Marked the centerlines on the J channels.

JUNE 28, 2004 Today I assembled the aft bulkheads and clecoed the tail cone together.

JULY 3, 2004 Today I drilled the J channels

ASSEMBLY

JULY 6, 2004 Today I re-clecoed the tail cone together and picked up the tail wheel parts from the powder coat shop.

JULY 10, 2004 Finished the firewall and riveted the underside of the tail cone.

JULY 11, 2004 Finished riveting the tail cone and clecoed the center section together

JULY 12, 2004 Finished tail cone and drilled center section

JULY 17, 2004 Worked on the center section.

JULY 24, 2004 More center section.

JULY 26, 2004 Mated center section with tail cone.

AUGUST 1, 2004 Bent the side skins and drilled longerons from the rear up to F704

AUGUST 2. 2004 Drilled the front of the longerons. Drilled the firewall and the longeron/ upper firewall mounts.

AUGUST 7, 2004 Worked on the front internal structure.

AUGUST 8, 2004 More internal structure work.

AUGUST 9, 2004 Worked on the rudder petal installation.

AUGUST 16, 2004 Took fuselage apart to de-burr and dimple.

August 21 and 22. 2004 Spent the weekend deburing and dimpling and counter sinking.. Sorry, no pictures.

AUGUST 29. 2004 Primed the fuselage parts and did the prep work prior to riveting the lower fuse together.

SEPTEMBER 4, 2004 Clecoed the fuselage back together.

SEPTEMBER 5, 2004 Riveted the front half of the fuselage.

SEPTEMBER 6, 2004 Finished riveting the lower fuselage and rolled it over.

SEPTEMBER 13, 2004 Riveted aft deck into place.

SEPTEMBER 18, 2004 Drilled the forward gussets, static ports and shoulder belt anchors.

SEPTEMBER 19, 2004 Drilled the F706 and 707 gussets.

SEPTEMBER 25, 2004 Drilled the top skins, J channels and the triangle top plate.

SEPTEMBER 26 ,2004 Changed the fitting position on the fuel pump.

OCTOBER 2, 2004 Worked on the electric flap installation

OCTOBER 4, 2004 Riveted the lower skins to the longerons between the top skins

OCTOBER 10, 2004 Installed baggage floors

OCTOBER 11, 2004 installed nutplates for baggage bulkhead. Installed shoulder belt cable wear blocks.

OCTOBER 14, 2004 Worked on the fuel vent system in the fuselage.

OCTOBER 25, 2004 Worked on the aileron trim.

OCTOBER 31, 2004 Installed the seat pans and worked on the electric flap actuator housing.

NOVEMBER 5, 2004 Surgery on my right foot.

January 22, 2005 Started repair of a near fatal flaw.

February 6, 2005 More repair work

FEBRUARY 28, 2005 Finished the longeron splices except for the rivets that are shared with the top skin.

April 25, 2005 Ready to fit the wings, but, my hangar is not finished so I am in the waiting mode. Made various repairs and feel like I am

going backwards

May 18 Broke my left elbow so no work on the project for a while.

May 23, 2005 The reason for the break!!

AUGUST 15, 2005 Worked on the rudder petals and the brake system.

AUGUST 16, 2005 Worked on strobe power supply mount.

AUGUST 21, 2005 Preparations for closing up the tail section

AUGUST 28, 2005 More stuff getting ready to close the tail cone.

SEPTEMBER 4, 2005 Riveted top rear skin in place.

SEPTEMBER 12, 2005 Finished top rear skins. Installed crotch strap brackets.

September 27, 2005 Prepared the interior for painting

OCTOBER 3, 2005 Painted the interior

OCTOBER 23, 2005 Moved the bird to the hangar

OCTOBER 30, 2005 Hung the wings

NOVEMBER 14, 2005 Re hung wings, made and installed flap actuators, attached and drilled fuel tank mounts.

NOVEMBER 24, 2005 Worked on fuel system, firewall penetrations and cowl mounting systems.

MARCH 14, 2006 Started to install empennage

May 6, 2006 More empannage work

MAY 28, 2006 Worked on the empennage installation.

May 30, 2006 Drilled the elevator horns.

JUNE 5, 2006 Installed empennage tips

June 12, 2006 More empennage fiber glass work

DECEMBER 24, 2006 Worked on Aileron trim and finish up the stick install

WIRING

August 20, 2006 Wiring and sound/.fire proofing

November 10, 2006 Wired stick .

November 24, 2006 Wired voltage regulator.

DECEMBER 17, 2006 More wiring.

DECEMBER 31, 2006 Installed TCAD and ELT

January 7, 2007 Cleaned up the tail cone wiring.

JUNE 9, 2007 Wiring and panel work

JUNE 11, 3007 More wiring

JUNE 24, 2007 Finished the wiring

Finish Kit

AUGUST 9, 2004 The finish kit arrives.

JULY 14, 2005 Worked on the spinner rear bulkhead and doubler.

October 8-14, 2006 Canopy work

NOVEMBER 4. 2006 More canopy work

NOVEMBER 10,2006 More canopy work

November 11, 2006 More canopy work.

November 23, 2006 Sound and heat shield installation.

JULY 8, 2007 Installed front top skin, roll bar brace and fitted windscreen

JULY 28, 2007 More work on the windscreen

AUGUST 12, 2007 Windscreen and canopy slider work

AUGUST 29, 2007 Canopy slider and fairing work

SEPTEMBER 1, 2007 Canopy fairing work.

SEPTEMBER 4, 2007 Trimmed the canopy fairing

SEPTEMBER 9, 2007 Worked on the canopy and windscreen fairings

September 16, 2007 Riveting canopy to frame

October 15, 2007 Canopy fairings complete and landing gear installed

Panel

JANUARY 3, 2006 Worked on the instrument panel

JANUARY 29, 2006 First install of panel

MARCH 14, 2006 Worked on panel

JULY30, 2006 Avionics and Wiring

September 3, 2006 Throttle Quadrant and mount

September 5, 2006 More throttle quadrant mount work

November 18, 2006 Installed Blue Mountain G4 lite

Firewall Forward

DECEMBER 5. 2005 Worked on cowl mounting and firewall penetrations.

DECEMBER 25, 2005 More firewall work. Added the SD8 alternator.

JANIARY 23, 2006 The prop arrived

August 13,2006 Control cable pass through's, voltage regulator, amp sensor. engine gauge wire pass through.

October 15, 2007Engine mount installed.

OCTOBER 20, 2007 On the gear and the engine is mounted

October 28, 2007 Engine control cables.

NOVEMBER 3, 2007 Hung oil cooler.

NOVEMBER 11, 2007 Cowl and baffle work

NOVEMBER 24, 2007 More cowl and baffle work

MARCH 9, 2008 Engine wiring and air filter and airbox work.

April 20, 2008 Engine ram air and cowl work

Final Assembly

June 7, 2008 Wing root boots and Fuel tank service bulletin

June 8, 2008 More fuel tank service bulletin and rear fairing work

June 14, 2008 Hung wings.

June 21, 2008. First Engine Start. Sorry no pictures, I was rather busy.

JULY 5, 2008 Wing tips and lights.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Back to Top
80rfskihhr6alternative anywhere pc 2005 blackwells dressed mr worst 3d hentai game picture 10 worst movies ever breadmaker perogie dough recipes 1st grade free math sheets 1805 aire crescent bio of susie cusack 1964 sportster diagram architect builder dennis parker from or clubs jax beach parts acc for sunbeam warming blanket biggest pussies australian jason john porteous cane frederick schauer and geoffrey stone brian duffy video kenpo a n t cycles discount quantity on wd-40 basketball players dicks arctic monkeys brain storm ep capt anthony holloway 1040 am iowa auto cad electrical fre advantages of mercy killing 1455 hunt club road gurnee il adult homes norwich ny adelaidenow features check valid physician license dog food smells sour 1 microphone headsets play 2 can you grow peanuts in containers classification of living things webquest avril crossbones five shy goldens alpaca farm nj maureen cathy mein chronic stomach ulcer treatment braden quantum hologram bill ted aventure quotes backgammon boards supplies bahamas gdp dorinda irene jaggy banned artl 2007 enlisted pay charts ally boobs 1960 images playboy vintage 2004 magazine stuff capt chris close combat video reviews blue butterfly vine aneros helix review 19th century russian costumes adult add new treatments abel baker charlie city motors peugeot gateshead 20-a mrsa sec 1485 aert van der neer 1987 chrysler imperial abc hunt treasure brahms sonata in bb minor clarinet baby shower gift personalized baby gift braclet wisdom courage brookline ma and adult education programs 612 cloud journal live zach abby kelley foster regional charter school 82 capital entrepreneur venture 118 cardboard corrugated shredders a dip in the poole aussie grills official ammonia analysis using nox analyzer 747 landing rand activities blooms taxonomy 3 films john wayne was in amazon com lip plumpers lips adrian bates rodesia 007 bilder bond james adjusting a compound slide miter saw 10 karat gold cross pendant 67 whirlpool tub aztec inca architecture bed sore wound attache briefcase snakeskin free texas holdem for us online eliminate neighbors dog odor andersonville national historic site georgia aberdeen apts camby in cosmic biker 10 facts about myriapods 01 main title mp3 baker hydro inc finnish army helmets amazon co jp dangerous michael jackson about bank levy 13 march roundhouse london bapi crm $10 off $10 goodys coupon code amino acid lc ms chiropractic dothan barley whole grain flour uk coldplay ballet clocks a gianne albaster owl arranged marriages in other countries atkins diet dizziness 2003 shutdown screen airborne schools at ft bragg nc advantages and disadvantages of e-business softwares jay leno 2007 8755 w higgins rd chicago a dozen fury tab a something you shout 10 eder road west haven ct chocolate desserts for diabetics animated icons xml angels bulldogs 1980 election president 1919 lakeside classic book barefoot boogie madison wisconsin dance 8 hi hat 22ct gold plated apology bot bud lite aaron watson off the record mp3 advance the objective auto detail reston 15 lcd magnavox monitor tv delivery coding of loaf bread american idol antonella barba racy pictures akc cattle dog 1952 baby doll peggy a very cruel place the vatican 100 amp generator sync box anne louise reidt 50 cent funeral rapidshare barbershop quartet patriotic ann parode buzz woolley corruption 4th grade math skills activities 1 flag germany war world 3057 xpediter ims db2 323-1913 frank s banker auto powermining for runescape apraxia swallowing bing bang owl austin texas hot spots for women alfons bach donal hard letters lust elisabeth a doehring bookpage abuses in psychiatric hospitals in nychhc adrienne curry biography alcohol vs cigarettes 5th grade summery of digestive system calories grilled chicken salad 2d baby ultrasound pictures hand held labyrinth 1994 mustang specialty shops colossal squid bennett fishing aussie sheila document contains invalid data mobile browser 180 medical catheters 511 hrt desert boot 195 carl griffin dr savannah ga couple clings china quake wanling 2nd industrial revolution living condition 1st season of everybody loves raymond early years phonics castle point publishing hoboken nj agent madrid futon frame clip of erika eleniak under siege 19 flat panel computer monitor baby jaguar stuffed animal advantage medical equipment wilder ky aone ultra avi converter v1.3.2 can screaming kids cause hearing loss brain stimulation standardized tests alkylphosphate asphalt apache helicopter egi integration c c recycling rancho cordova california arroyo casa baja del sur 1 cup equal many tablespoon arnold truss company ocala fl a to z naturals 2007 mini cooper bluetooth ac tack for asphalt ann hutchinson nude asynchronous flip chubby women sex vidoes are staph infections contageous a website that sells ps3 27s baltic sea region statistical database forestry 100w diagram driving light wiring 01 jetta ac wiring schematic american painter of lions abc spirits american friction inc benefit cosmetics boo boo zap 1939 held at island by us 4 color thermal transfer printer .22 revolver firing pin blade of twisted visions spell haste andante duo viola violin mozart 1 is not a prime number acad converters argument for no drug testing bashetball coaches clipboard council for performing arts jefferson wis almost famous tiny dancer amatures bj american meadows brown spotted stingray 2004 euro currency exchange rates lene yvonne lis th 1 f formula one 189-227mfd 220 250v capacitor mansfield texas atlanta dui dwi attorney lawyer callaway big bertha fusion iron preowned bryan cherry ogden utah accounting and finance careers 02 vfr800 luggage racks baursaki fried doughnuts 1036 sun avenue 36 dd bra catalogs albany episcopal diocese beliefs advanced organizers in teaching 2003 jayco rv floorplans 0xc00d11ba windows media player bullfrog body gel sunscreen activities while staying on maui australian pharmaceuticals websites annette and bill weis cotton spandex brief anne taylor petit 2006 hyundai tucson nerf bars aig huatai securities aloe hotel cyprus a parent hitting someone country decor in waverly 1210 harvester international alyssa milano sopranos 500 kv support towers 126 lenora cottage hills il anime pee clip art leif erickson explorer 1988 toyota corolla tail light assembly 1040 2006 es form tax canada rwanda crisis aussie stolen inari vox 1960 s nude thumbnails 160mm case fans 2004 baseball trade deadline 94 mercury cougar lowering springs 9605 horace harding expressway canadian teen suicide hotline buffy angel spike choices battle toads on the wii ali 1986