OCTOBER 11, 2004
The wear block for the shoulder belt cable is now installed.
Nutplates are clecoed and ready to rivet.
The first nine nutplates are riveted in.
A shot of the wear block from the front side of the baggage bulkhead. Note the reflection of me and the camera!!

This is a number 30 hole in my hand. Hurts a little!! I had a rough morning and should have waited until I could concentrate on what I was doing. Be careful while building, there are many ways to get hurt. I will wait until I am in a better frame of mind before starting to build again.