DECEMBER 24, 2006

 

These first three crappy shots are of the holes I drilled for the two new ribs that are needed to install the shelf for the traffic system. I will finish this next weekend. By the way, that is settled dust, not corrosion. I will clean this area before I install the new structure.

 

 

 

I reinstalled the push rod between the two sticks and torque sealed them

The plates and springs in the two shots above are for the electric aileron trim

I installed the sticks and attached the castle nuts and cotter pins.

 

NEXT PREVIOUS HOME