DECEMBER 24, 2006
These first three crappy shots are of the holes I drilled for the two new ribs that are needed to install the shelf for the traffic system. I will finish this next weekend. By the way, that is settled dust, not corrosion. I will clean this area before I install the new structure.
I reinstalled the push rod between the two sticks and torque sealed them
The plates and springs in the two shots above are for the electric aileron trim
I installed the sticks and attached the castle nuts and cotter pins.